4.16 Frequency Response (BTL)

Measurement bandwidth filter 80 kHz.
10
8
6
4
2
0
-2
-4
-6
-8
-10
20
4.17 Frequency Response (PBTL)
Measurement bandwidth filter 80 kHz.
10
8
6
4
2
0
-2
-4
-6
-8
-10
20
4.18 High-Current Protection (BTL)
Input 1-kHz bursted signal, load 1 Ω
SLAU239A – February 2008 – Revised September 2015
Submit Documentation Feedback
50
100
200
500
f - Frequency - Hz
Figure 19. Frequency Response (BTL)
50
100
200
500
f - Frequency - Hz
Figure 20. Frequency Response (PBTL)
Copyright © 2008–2015, Texas Instruments Incorporated
TAS5342DDV6EVM Performance
6W
4W
1k
2k
5k
10k
8W
4W
2W
1k
2k
5k
10k
8W
20k
3W
20k
19
TAS5342DDV6EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PurePath Digital TAS5342DDV6EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents