Physical Specifications
PCB dimensions:
Total weight:
Note: All electrical and audio specifications are typical values.
4.1
THD+N vs Power (BTL –4 Ω)
Gain: +2.5 dB set in TAS5508B
10
5
2
1
0.5
0.2
0.1
0.05
0.02
0.01
0.005
20m
THD+N vs Power (BTL –6 Ω)
4.2
Gain: +2.5 dB set in TAS5508B
SLAU239A – February 2008 – Revised September 2015
Submit Documentation Feedback
Table 11. Physical Specifications
124 × 150 × 54 Width × Length × Height (mm)
500m 1
50m 100m 200m
Power - W
Figure 4. THD+N vs Power (BTL – 4 Ω)
Copyright © 2008–2015, Texas Instruments Incorporated
TAS5342DDV6EVM Performance
Notes/Conditions
370 gr Components + PCB + Heatsink + Mechanics
2
5
10
20
50
100
200
11
TAS5342DDV6EVM
Need help?