This appendix comprises design documents pertaining to the TAS5162DDV6EVM evaluation module. The
documents are presented in the following order.
•
Schematic (8 pages)
•
Parts List (2 pages)
•
PCB Specification (1 page)
•
PCB Layers (4 pages)
•
Heat-Sink Drawing (1 page)
SLAU239A – February 2008 – Revised September 2015
Submit Documentation Feedback
Copyright © 2008–2015, Texas Instruments Incorporated
SLAU239A – February 2008 – Revised September 2015
Design Documents
Appendix A
25
Design Documents
Need help?
Do you have a question about the PurePath Digital TAS5342DDV6EVM and is the answer not in the manual?