TAS5342DDV6EVM Features
•
5/6-channel PurePath Digital™ evaluation module
•
Subwoofer line output (LFE Output).
•
Self-contained protection system (short circuit and thermal).
2
•
Standard I
S and I
•
Double-sided, plated-through PCB layout.
4
TAS5342DDV6EVM
section for more information.
2
C/control connector for TI input board