STEP 5
Cable Installation (Continued)
Follow instructions (a) through (c) to install the cable nut and the stack rod.
(a) Insert the cable nut as indicated by the arrows onto the weight stack rod
(A7) at least 20mm deep as shown.
(b) Take out the stack fork (A6) and lift the upper stack carriage set (32) up.
(c) Insert the stack fork (A6) into the stack rod (A7) to loosen the cable.
(a)
(b)
(c)
23