Preseason Preparation - Sea-doo RXT iS 255 2009 Shop Manual

Table of Contents

Advertisement

PRESEASON PREPARATION

Proper vehicle preparation is necessary after the
winter months or when a vehicle has not been
used during several weeks.
Any worn, broken or damaged parts found during
the storage procedure should have been replaced.
If not, proceed with the replacement.
WARNING
Unless otherwise specified, engine should be
turned off during preseason preparation pro-
cedure.
Using the maintenance chart, performed items in
the columns indicated 100 HOURS OR 1 YEAR
and TO BE PERFORMED BY.
smr2009-013-001_a
1. Use these columns
Furthermore, proceed with the following:
Watercraft Prepared as per Storage Procedure
– Reinstall the battery.
– Test ride watercraft to confirm proper opera-
tion.
Watercraft Not Prepared as per Storage Proce-
dure
– Replace engine oil and filter.
– Drain fuel tank and fill with fresh fuel.
– Reinstall the battery.
– Test ride watercraft to confirm proper opera-
tion.
smr2009-013
Section 01 MAINTENANCE
Subsection 02 (PRESEASON PREPARATION)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gtx limited is 255 2009

Table of Contents