Start-Up Inspection - Sanwa DCM2000DR Instruction Manual

Digital clamp meter
Hide thumbs Also See for DCM2000DR:
Table of Contents

Advertisement

[5] MEASURING PROCEDURE
1. Do not apply an input signal exceeding the maximum rated value
of each function.
of the test probe or the part past the barrier of the clamp sensor.
and test lead from the object measured and return the function
switch to the
5. Use test leads matching the measurement category of the
measured point.

5-1 Start-up Inspection

Check the following items before proceeding to measurement.
batteries with new ones.
wire disconnection or crack.
the test leads are free of wire disconnection.
5-2
Auto low-impedance voltage/resistance detecting
effects in measurements of a circuit with ground-fault interrupter
or circuit/device with low current capacity. When measuring a
or
function.
internal resistance is switched immediately so the load current
WARNING
position.
and short the test pins to check that
WARNING
— 11 —

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents