52
Joining the shipping splits
The busbar systems and wiring harnesses of two shipping splits are joined in the
common motor terminal cubicle (if present) or a busbar joining cubicle. Special M6
screws for fastening the shipping splits together are enclosed in a plastic bag inside
the rightmost cubicle of the first shipping split. The threaded bushings are already
mounted on the post.
Procedure
• Fasten the front post of the joining section with 7 screws to the front frame post of
the next cubicle.
Mechanical installation
Threaded bushing
Maximum tightening torque:
5 Nm (3 ft.-lbs)
7
7