100W C-Band Transceiver
Installation
Figure 2-7. Install CSAT 100 Watt Unit
Ensure the brackets are centered in each Unistrut. Ensure the unit is positioned
with the fan facing outward and free of any obstructions. Do not tighten bolt (5)
at this time.
IMPORTANT
13. Slide two springnuts, (4, figure 2-2) into channel of
the Unistrut brackets
(1, figure 2-1).
14. Repeat procedure for second Unistrut bracket.
15. Install brackets (1, figure 2-2) and secure to Unistrut
bracket with bolts (6), flat washers (2) and split lock
washers (4).
16. Install four bolts (6, figure 2-2), flat washers (2) and
splitlock washers (3) on the CSAT unit.
17. Lift the CSAT unit and slide bolts (6) into the
grooves of the brackets (1).
18. Ensure the washers are against the bracket.
19. Tighten the bolts.
2-8
Revision 0
MN/CSAT5060100.IOM