100W C-Band Transceiver
Installation
27. Ensure that the ports line-up and can be secured. If a gap is present, adjust by
sliding the unit and bracket (1, figure 2-2) on the Unistrut (In or Out).
28. Tighten hardware.
29. Install the assembled waveguide switch (Figure 2-19) and waveguide gaskets.
30. Secure assembly with bolts, lock washers and flat washers from hardware
kits supplied with each CSAT unit (not shown, PN AS/0402-2).
Figure 2-25 Waveguide layout
Figure 2-24. Installation of the
2-25
Revision 0
MN/CSAT5060100.IOM
Waveguide Switch.