Circuit Leak Test - PIAGGIO MP3 400 i.e. Service Manual

Hide thumbs Also See for MP3 400 i.e.:
Table of Contents

Advertisement

MP3 400 i.e.
After switching to «ON», check that there is battery
voltage, for about 2 seconds, between the Black-
Green cable of the pump connector and the
ground lead with the pump connector disconnec-
ted. Otherwise, check the continuity of the Black-
Green cable between the pump connector and the
remote control base.
Check the efficiency of the earth line of the fuel
pump by measuring the continuity between the
pump connector black cable, system side, and the
earth.
If, when switching to «ON», the pump continues to
turn after 2 seconds of activation, check, with the
control unit disconnected and the injection load re-
mote control disconnected, that the Black-Purple
cable (pin 20 on the interface wiring) is insulated
from the ground.
Specific tooling
020331Y Digital multimeter

Circuit leak test

Install the specific tool for checking the fuel pressure, with the pipe fitted with the gauge.
Injection
INJEC - 19

Advertisement

Table of Contents
loading

Table of Contents