Configuration Of The Action (Command) - Funkwerk bintec R230aw User Manual

Hide thumbs Also See for bintec R230aw:
Table of Contents

Advertisement

4
Submenu Schedule & Monitor
26
bintec User's Guide
Field
Status
Table 4-3:
S
S
YSTEM
CHEDULE
S
E
CHEDULE
VENTS
4.2.2

Configuration of the Action (Command)

The S
C
CHEDULE
OMMANDS
The S
S
YSTEM
CHEDULE
S
C
menu displays a list of all already configured actions.
CHEDULE
OMMANDS
Entries are added or modified in the S
S
(T
& SNMP)
CHEDULER
IME
Description
This field cannot be edited and shows the sta-
tus of the trigger.
Possible values:
error - An error has occurred; the configura-
tion of the trigger is not consistent.
notavail - The status cannot be determined,
e.g. if the scheduler has not yet been acti-
vated (default value).
Possible values for
TYPE
active - The trigger is currently active.
inactive - The trigger is inactive.
& M
E
S
ONITOR
VENT
ADD/EDIT
menu is described below.
& M
E
S
ONITOR
VENT
CHEDULER
S
YSTEM
CHEDULE
S
C
CHEDULE
OMMANDS
= time:
(T
& SNMP)
CHEDULER
IME
(T
& SNMP)
IME
& M
E
ONITOR
VENT
ADD/EDIT menu.
System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bintec r230aBintec r232bBintec r232bw

Table of Contents