Installation - King gates Intro 230 Instruction Manual

Motorgear for swing gates
Table of Contents

Advertisement

5 - INSTALLATION

-The installation and testing operations must be performed solely by qualified personnel in order
to guarantee the proper and safe operation of the automatic gate.
-Antoniolli Mario & C. s a s, declines any responsibility for damage caused by incorrect
installations due to incompetence and/or negligence.
-Before assembling the automatism, check that the gate is in perfect working order, hangs well
on its hinges and is suitably lubricated. It must also comply with the safety standards in force in
the country of installation.
Introductory note: Dig a hole big enough to hold the foundation box, calculate the required
opening angle, insert the sheath for laying the power cable and that for laying the limit switch
cables (where applicable), make water drainage holes in the ground and cement the box solidly.
5.1 ESTABLISH THE REQUIRED OPENING ANGLE
PILLAR
PILLAR
OPENING ANGLE 90°
90°
OPENING ANGLE 110°
110°
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intro 24

Table of Contents