Installation; Plate Fixing; Rack Fixing; Final Adjustment - King gates Dynamos 500 Instruction Manual

Table of Contents

Advertisement

Read the instructions with care before installing the product.
The producer disclains all responsibility for any damage or bad functioning caused by
non-osservance of the instructions or bad connection that may result in poor safety and
functioning of the gear-motor.

PLATE FIXING

Tighten the two foundation tie-beans on the plate with the two M10 nuts (pic.2)
In accordance with the size, fix the plate on a concrete base of adeguate dimension,
complying with fixing distances which have to be vertical and parallel to the gate.
Arrange one or more sheaths for electric cables (pic.3).
Once the base has hardened, loose the nuts, place the gear-motor on the foundation plate
ascertaining it is parallel to the gate, and gently tighten the two nuts provided (pic.4).

RACK FIXING

Set the gear-motor on manual functioning (pic.10).
Wide open the gate's door.
Place the rack, place the first element on the pinion and fix it with M6 screws to the gate
(pic.5) Move the door manually and repeat the procedure with the other elements using a
distance spacer to ensure the correct position from the rack (pic.6). It is advisable to leave
2mm between the rack the gear to avoid the gate resting on the gear-motor (pic.7).

FINAL ADJUSTMENT

For the final height adjustment between the motor and the rack, use the 4 screws located
on the external sides for a height up to 15mm (pic.8).
The final fixing of the gear-motor is done by tightening the 2 nuts placed on the
foundation tie/beans.

INSTALLATION

GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents