Maintenance; Full Delivery; Transport And Warehousing; Termination Of Operation 3 - ATTACK ELECTRIC 08 Instructions For Use Manual

Wall hung, electric
Table of Contents

Advertisement

dependent on the demand of regulation and the safety
traffic and heat systém.
The pump has antiblocking function. More detailed
information are stated in the chatter No. 1.7.4 "
Protection function of the boiler".
Time running out of the pump make possible to take
away heat accumulated in the boiler body in time of
switching off the boiler. The effect is decreasing of
losses, removing of temperature tops, reducing of stone
and elongation of boiler life time.
Time running out of the pump is preset from the
production facility according to the point 2.4.
The pump is protected against blocking in operation
mode Stand-by. (see the chapter Protection functions).
If the boiler is for longer time out of its operation
switched off, we recommend, we recommend you to
switch on the boiler sometimes, minimally 1x per month
(see the chapter protection of function).
Electric data of the pump
I 1/1(A)
Min
0,05
Max
0,52
P1 - pump input
I - electric current
4. Termination of operation
Concerning termination of boiler operation carry out it
by switching off the switcher in the lower part of the
boiler, by switching off the main switcher on the
electric supply feeding.
Service repairs see below mentioned instructions:
Disconnect boiler from electric supply
feeding by main switcher and contact
your service man!
Breakdowns of the boiler have to be
repair only by professional person!
Attention!
There is threat of casualty by electric
current!

5. Maintenance

Regular maintenance helps you to eliminate possible
defects. We recommend you to carry out complete
maintenance 1 time per year before starting heating
system. It is not allowed the taking off the cover. The user
P1(W)
Mpa
4
52
0.3
is able to clean surface of the cover with detergents and
control operation modes or fill heating water to the system
checked by water pressure dawn according to the value on
the thermomanometer.
The service man during the regular control and
maintenance carry out tightening of all electric
connection, control tightness of all connection and control
quantity of water in the heating system, clean the water
filter, pump, control 3-ways valve control and switching
relay including starting function of the boiler.
Well, also the control of all safety and switching elements
will be carry out by heating operation and right function of
heating elements.

6. Full delivery

The electric boiler is delivered assembled
Full delivery of electric boiler consists of:
electric boiler assembled,
instruction manual,
guarantee card,
bushing,
deaerate valve,
bonding of switch board to electric supply connection
1 x 230 V.
Accessories whose are not part of the full
delivery:
conductors for supply connection of boiler and three
ways valve (in case that you have installed the storage
water tank) and for connection of the room thermostat
fixing set.
Module TUV.
Module GSM.

7. Transport and warehousing

The boiler is protected by its packaging during
warehousing and transport. It is necessary to eliminate
effects of magnetic and other influences on the
packaging.
It is necessary to eliminate concussions and to avoid
slighting out the boiler from the packaging.
Manipulate with the boiler and put it into position
according instruction marked on the packaging.
Regarding warehousing is necessary to assure standard
warehousing conditions (no aggressive environment
without dust, temperature from 5° C to 50° C, humidity
to 75 %, no expose to biological influences, shocks and
vibration).
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Electric 15Electric 24

Table of Contents