Dear customer, Thank you for buying a universal ATTACK FD boiler and trust expressed to our company -- ATTACK, s.r.o. ATTACK FD boiler is certified for burning coke, wood and black coal. To get used to right handling with your new product, read instructions for its use. Please follow the further information to ensure long-time operation without breakdowns to your as well as our satisfaction.
CONTENTS 1 Use and preferences of the boiler..............4 2 Technical data on ATTACK FD boiler.............4 3 Dimensions of ATTACK FDboiler..............5 4 Head losses.......................5 5 Description of ATTACK FD................6 6 Localization and installation of the boiler............6-7 7 Supply and wrapping..................8 8 Appliance for excessive heat removal - cooling circuit.........
1. The use and preferences of the boiler Four-element size of ATTACK FD is suitable for reconstructions of heat sources in dwellings, for smaller flats and recreation facilities. Bigger size of the boiler suits to requirements for heating in family houses, shops, schools and similar..
A boiler has to be chosen in order for its nominal output to respond to losses of a heated object. When you choose a boiler with a too high nominal output, it can cause higher tarring and dew of the boiler. 3. Dimensions of ATTACK FD M C.H. passage 2”...
*) recommended value Possibilities of localization ATTACK FD boilers is certified for installation in spaces not serving for common life (cellar, halls, etc.) Localization of the boiler by fire regulations : 1. Localization on a floor of an incombustible material (fig.)
2. Safe distance from combustibles - during the installation as well as during the operation of the boiler it is necessary to keep the safe distance from combustibles Podmurovka - for easy combustible substances of combustibilitz level C, that burn quickly and go on beurning even after removing the source (e.g..
95°C. Return water is carried with the help of an interconnection between cooling circuit and the flange of return water. To all the ATTACK FD boilers used in the system of closed ventilation it is NECESSARY to use a cooling circuit and a termoregulation valve, in order to accept the warranty.
9. Boiler assembly Set the boiler body on the place, connect heating and return water with the help of flanges with the G2" internal thread. To the outlet of heating water in the upper part of the boiler body, adjust a pipe on the G2 thread and a cooling loop on the pipe, then connect to the heating system.
LEGEND 4 Protection deflector 1 Left side 2 Right side 5 Control board 6 Cover 3 Posterior superior boardt Obr. 6 b) Assembly of the control rod of chimney flap Assembly of the control rod of the chimney flap is done in this way:: - punch holes in the skeleton (in the right lateral side) - insert the rod pos.
13. Draught regulator Draught regulator - thermostatic regulator is equipped with a thermosetting resin knob of an adjustment field from 30 to 100°C (fig.7). Screw the regulator on the 3/4“ opening of the front head and orientate the red index on the upper part. The lever with the chainlet should be introduced in the regulator holder after removing the plastic lock.
15. Attendance of the boiler by a user COKE The most suitable fuel is coke of 24-60mm grain-size. WOOD To reach the nominal output it is necessary to keep the max. 20% moisture content of wood Fuel must be stored in dry place.. Cleaning of the grid is made so as not to let burning fuel drop down to the ash collection basin.
IMPORTANT WARNING : 1. Attendance of the bboiler can be only carried out by adults familier with this instruction. To leave children without a supervision of adults near the boiler is not allowed. Any interventions endangering the health of people attending or aothers are not allowed.
18. Warranty and responsibility for defects User is obliged to order putting into operation in a specialized company , for defects is responsible a service company certified by the manufacturer and only maintenance should be performed by the user himself.. Maintenance of the boiler must be performed regularly by the user.