Maintenance - Siemens SINAMICS G120 Hardware Installation Manual

Power modules pm240p-2, ip20
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Service and maintenance

6.1 Maintenance

6.1
Maintenance
The purpose of maintenance is to maintain the specified condition of the Power Module.
Regularly remove dirt and pollution, and replace the fan in plenty of time.
fan (Page 55)
Cleaning
Clean the inverter with an anti-static brush, a vacuum cleaner and areas that are difficult to
access, using dry compressed air (max. 1 bar).
Ventilation
The devices must be installed in a cabinet. Ensure that the cabinet's ventilation slots are not
blocked. Check that the fan is functioning correctly.
Cables and screw terminals
Regularly check the cables for damage, and immediately replace any defective parts.
Regularly check that the screw terminals have been correctly tightened. Retighten the screws
if necessary.
Note
The actual maintenance intervals depend on the installation and operating conditions.
Siemens offers its customers support in the form of service contracts. For further information,
contact your Siemens regional office or sales office.
54
Hardware Installation Manual, 11/2016, A5E37800827C AB
Replacing a
PM240P-2 Power Modules

Advertisement

Table of Contents
loading

Table of Contents