ABB COMMANDER 351 User Manual page 28

Table of Contents

Advertisement

...2 OPERATOR LEVEL
2.9.2 Using the Control Efficiency Monitor
351. 5
350. 0
70
+
rAtE
10. 1
OVEr
10
rAtO
0. 2 5
Prd
35
SEtL
0. 3
IAE
2. 1
351. 5
350. 0
26
Press and hold the
Note.
If the front panel keys are not operated for 60 seconds whilst
any Control Efficiency Monitor frame is being displayed, the
instrument reverts to the first operating frame.
Rate of Approach to Set Point
The rate of change of the process variable between 5 and 95%
of the step change (Y
minute.
Rate of approach =
Overshoot
The maximum error, expressed as a percentage of the set
point.
Overshoot =
Set Point
Decay Ratio
The ratio of the amplitude of the first and second overshoots.
X
2
Ratio =
X
1
Period
The time (in seconds) between the first two peaks (t
Settling Time
The time taken (in minutes) for the process variable to settle
within ±2% of the set point value (t
Error Integral
The integral of the error value until the process variable settles
to within ±2% of the set point value in 'engineering-unit hours'.
Error integral =
Return to the first operating frame.
and
keys for 2 seconds.
), measured in engineering units per
2
Y
1
t
approach
X
1
x100
).
settle
t
settle
|
|
PV – SP
dt
0
).
period

Advertisement

Table of Contents
loading

Table of Contents