System Daily Start-Up - Glas Craft MH II User Manual

Dispensing system
Hide thumbs Also See for MH II:
Table of Contents

Advertisement

System Daily Start-Up

1.
Uncoil hose.
2.
Check desiccant dryer beads to insure they are
still purple and have not changed to pink.
3.
Check and lube top of the fluid section.
Wipe off residual material
and add a tablespoon of
DOP or materail suppliers
reccommended lubricant.
4.
Check material screens at the gun and transfer
pumps.
5.
Start the drum mixer and it run to material suppliers
specifications. (20-30 minutes)
6.
Turn on the hose controller and set the temperature
according to material suppliers specifications.
Operation
7.
8.
For Programing
9.
Use Only
Up & Down
Buttons
Green Power
On Button
49
Once the hose temperature reaches 120º, It's ok to turn
on the primary heaters and set temperature to material
suppliers specifications.
Power on
Depress yellow slide valve to open main air to gun
and transfer pumps.
Flip retract switch to "run"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents