Fujitsu IP-920 E/DC Hardware User's Manual page 96

Table of Contents

Advertisement

Appendix
(6) Turn on
1) Set Power button on the front panel to [ON].
2) Check PWR LED lamp on the front panel is on.
(7) Unit test
1) Since this device executes a self-check immediately after power is turned on, check
the RDY LED on the front of the panel does not light after power is turned on.
2) The LEDs light if the self-check detects an unusual condition.
(8) System test
1) Software installation
Install appropriate software following IP-900 Series Software User's Guide.
2) Set-up check
Various devices settings complying with the system specification are made from the
control terminal either directly or via the network.
3) Input video check
Check the video input to this equipment is correctly output to the monitor (television).
4) Data communication check
Check the line used by the system is connected.
5) Status check
After the final setup, when the equipment is in the system operation state, check this
equipment status LED (RDY) on the front of this equipment lights in green, and that the
alarm LED (ALM) is off.
IP-920E/DC
82

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents