Program Execution Order; Execution Order Of Program Elements - Mitsubishi Electric MELSEC iQ-R Series Programming Manual

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

7.2

Program Execution Order

Execution order of program elements

The execution order of program elements in the FBD/LD editor is determined by the location and connecting status.
(1)
7
(2)
(1) Program elements are executed from left to right.
(2) Program elements are executed from top to bottom.
The execution order is displayed under each program element. After the program is converted, the determined execution
order is displayed.
7 FBD/LD
85
7.2 Program Execution Order