J2Kn Pro Start-Up - Ecom J2KN pro Operation Manual

Hide thumbs Also See for J2KN pro:
Table of Contents

Advertisement

7. J2KN Pro Start-up

Display contrast:
Lighten F1
Darken F2
1. Switch on the J2KN base unit and the remote control
unit. The Main Menu is displayed with 8 sub-menus:
- Gas analysis
- Averaging
- Draft/Pressure
- Soot Test
- Automatic meas.
- Adjustments
- Control
- Diagnostics
2. Select Gas Analysis and press <OK>
3. Press Up/Down to select Fuel Type
and press <OK>
4. Analyzer will complete auto-zeroing
of all sensors, except the O2 sensor
which is calibrated to 20.9%
Make sure the probe is in fresh air when you
turn on the J2KN Pro.
Gas analysis
Averaging
Draft/Pressure
Soot Test
Automatic meas.
Adjustments
Control
Diagnostics
View gas readings & calculations
Perform averaging tests
Calibrate pressure sensor
Perform soot/smoke density test
Data logging onto memory card
(Pro Easy & IN) and set up auto-
matic test cycles (Pro IN only)
Modify J2KN settings
Diagnostic info/Calibration mode
(Only used with ECOM AK tool)
Fuel type
Gas-Natural
CO2max
11.7
Select: (
Radio Link
Quality Indicator
Battery Charging
Indicator
A1
B
0.35
0.006

Page 13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the J2KN pro and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents