IDEAL Viceroy GT 8 Installation And Servicing page 21

Hide thumbs Also See for Viceroy GT 8:
Table of Contents

Advertisement

27 FITTING THE CASING SUPPORTS
1. Fix the lower casing supports to the framework using
one M8x25 bolt and lock washer for each support.
Note.
The quantity varies according to the boiler length.
1
28 INSTALLING THE INSULATING MATERIAL
1. Lay the insulation panels over the boiler.
2. Secure the insulation in place by tying each
strap to the lower casing support at each
side of the boiler.
Note.
The table below indicates the quantity of
insulation panels supplied for each boiler and
the appropriate position according to their
width.
3. Fit the rear insulation.
Note.
This will be held in place by the rear panels
when fitted later (Frame 35).
Boiler
Body insulation width
Front
500
500
GT 8
1
GT 9
1
1
GT 10
1
1
GT 11
1
1
GT 12
1
2
GT 13
1
2
GT 14
1
2
Viceroy GT -
Installation & Servicing
INSTALLATION
vic7102
HM 8x25
Rear
600
800
900
1
1
1
1
1
1
1
Note.
For pre-assembled boilers loosen
the base frame securing bolts.
1
vic7118
vis7103
vic7117
2
3
21

Advertisement

Table of Contents
loading

Table of Contents