ergoline AFFINITY 700 ADVANCED PERFORMANCE Operating Instructions Manual page 166

Affinity series 700/900/990
Table of Contents

Advertisement

Available languages

Available languages

Cleaning and maintenance
70/84
Screw the lid with the hose onto the new canister.
Push the hose well down so that it touches the bottom of the canister.
Put the canister back in the device.
Close the bed base. You should hear the bed base click into place.
Venting
NOTE:
To ventilate, access to the Professional Setup Manager on
the control panel is required.
Go to the Professional Setup Manager.
Activate the fill mode in the AQUA FRESH AROMA menu.
Close the canopy.
The system will now be ventilated for 60 seconds. The AQUA SYSTEM liquid
will be released from the nozzles during this period.
Then test the AQUA SYSTEM in test mode. In test mode, the nozzles
spray for 3 seconds. Repeat the ventilation process if it does not work.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents