Smart Link-Track-Cfd Collaboration Configuration Example - HP 5900 Series Configuration Manual

High availability configuration guide
Hide thumbs Also See for 5900 Series:
Table of Contents

Advertisement

[SwitchB-Vlan-interface2] display vrrp verbose
IPv4 Virtual Router Information:
Running Mode
Total number of virtual routers : 1
Interface Vlan-interface2
VRID
Admin Status
Config Pri
Preempt Mode
Auth Type
Virtual IP
Virtual MAC
Master IP
The output shows that when the uplink interface on Switch A is shut down, the priority of Switch A
decreases to 80. Switch A becomes the backup, and Switch B becomes the master. Packets from Host A
to Host B are forwarded through Switch B.

Smart Link-Track-CFD collaboration configuration example

For information about the Smart Link-Track-CFD collaboration configuration example, see
Smart
Link."
: Standard
: 1
: Up
: 100
: Yes
: None
: 10.1.1.10
: 0000-5e00-0101
: 10.1.1.2
154
Adver Timer
: 100
State
: Master
Running Pri
: 100
Delay Time
: 0
"Configuring

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5920 series

Table of Contents