Dell SC8000 Deployment Manual page 50

Compellent storage center
Table of Contents

Advertisement

Chapter 2 Install the Hardware
4 Insert riser 1.
a Align the riser with the connector and the riser guides.
b Lower the riser into place until the riser is fully seated in the connector.
Table 2. Removing Riser 1
1 Riser 1 cage
2 Riser 1
3 Riser guide, back (right)
40
2
1
5
6
4 Riser guide, back (left)
5 Riser 1 connector
6 Riser guide, front
Storage Center SC8000 Controller Deployment Guide
3
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents