Commissioning; Scope Of Delivery; Initial Commissioning - Inolab pH level 2 Instruction Manual

Laboratory ph meter
Table of Contents

Advertisement

Setting the date
and time
3

Commissioning

3.1

Scope of delivery

l
Laboratory measuring instrument, inoLab pH Level 2
l
Plug-in power supply
l
Operating manual and short manual in the cover
l
4 x type AA Mignon 1.5 V batteries
3.2

Initial commissioning

Perform the following activities:
l
Set the date and time
l
Connect the plug-in power supply.
1 Press and hold down the
e
2 Press the
The Display test appears briefly on the display.
The measuring instrument then switches automati-
cally to the setting of the baud rate.
g
3 Press the
the display.
4 Set today's date by pressing
5 Confirm with
The date (month) flashes on the display.
6 Set the current month by pressing
7 Confirm with
8 Set the current year by pressing
9 Confirm with
play.
10 Set the current time by pressing
11 Confirm with
The minutes field flashes on the display.
12 Set the current time by pressing
m
key.
key.
key repeatedly until the date flashes on
u d
g
.
g
. The year appears on the display.
g
. The hour field flashes on the dis-
g
.
Commissioning
.
u d
.
u d
.
u d
.
u d
.
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents