L.L.Bean MISSION STORAGE CONSOLE Assembly Instructions Manual page 5

Table of Contents

Advertisement

STEP 12
Place wood pins into predrilled holes in top of center
assembly (CD) as shown.
STEP 13
Have second person assist with aligning predrilled
holes in underside of top (E) with pins in top of
center assembly (CD). Secure top using four 1 1/4"
#8 screws. Thread screws through predrilled holes
in corners of top (E) and into pilot holes in top ends
of base assembly (AB).
Tighten all screws (including those left loose in
Steps 5 and 6) securely and cover screw holes with
wood plugs. Tap wood plugs gently with hammer to
secure.
STEP 14
Place wood pins into each of the holes in the faces
of the uprights of both the base assembly (AB) and
center assembly (CD) as shown. These will support
the removable shelves.
ATF4/5041115

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MISSION STORAGE CONSOLE and is the answer not in the manual?

Questions and answers

Table of Contents