Does the computer room have
access control (for example, will HP
representatives need a security code)?
Are all floors, stairs, elevators,
stairwalkers, lifts, ramps, or ladders
needed to move the equipment
adequate to support its weight and
size?
Will the equipment fit through all doors
and corridors and in lifts?
Does the building have a loading dock?
Maximum access height is _____m.
For any additional equipment required
(for example, connectors, receptacles,
cables, and any equipment not supplied
by HP), is the equipment on site and
ready for use?

Site prep time allowances

The following site prep tasks may require several weeks:
Acquiring required power connectors
Arranging for an electrician
Adding or modifying air conditioning systems
Making building alterations
Placing an order for data comm equipment
The time between placing an equipment order and actual delivery can vary. Contact
your HP representative to determine the best estimated delivery dates.