Site prep time allowances
16
The following site prep tasks may require several weeks to complete:
• Acquiring required power connectors
• Arranging for an electrician
• Adding or modifying air conditioning systems
• Making building alterations
• Placing an order for data comm equipment
The time between placing an equipment order and actual delivery can vary.
Contact your HP representative to determine the best estimated delivery
dates.
HP StorageWorks XP12000 Disk Array Site Preparation Guide