Installation; Regulations Governing Installation; Package List; Choice Of The Location - REMEHA P 420 Installation And Service Manual

Fuel oil/gas boilers
Hide thumbs Also See for P 420:
Table of Contents

Advertisement

4 Installation

4.1 Regulations governing installation

Installation must be carried out in accordance with the
prevailing regulations, the codes of practice and the
recommendations in these instructions.

4.2 Package list

See assembly instructions.

4.3 Choice of the location

4.3.1
Main dimensions
(a) Boiler flow - weld
(b) Sludge removal hole Ø Rp 2 1/2 - plugged
Boiler type
ø A
ø B
ø C
D
E
J
L
S
8
P 420-8
P 420-9
250
250
2" 1/2
2" 1/2
plate intact or pre-drilled to the diameter specified on order
235
235
1427
1427
1800
1950
1505
1665
1183
1343
(c) Boiler return - weld
(d) Rp 2 draining outlet - plugged
P 420-10
P 420-11
250
300
2" 1/2
3"
235
254
1427
1447
2120
2305
1825
1985
1503
1663
P 420
P 420-12
P 420-13
300
300
3"
3"
254
254
1447
1447
2465
2625
2145
2305
1823
1983
16/03/2016 - 300016839-03
P 420-14
300
3"
254
1447
2785
2465
2143

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents