Verifying Fibre Channel SFP operation

Procedure
1. Reconnect the FC cable to the SFP and verify that the link status LED is solid green. For more information,
see "Related reference".
Related reference
Status LED descriptions on page 15

Removing and replacing the fan control card cable assembly

CAUTION:
This procedure requires removing the enclosure from the rack. Before removing the enclosure, ensure
that data on the system is backed up. Back up data if necessary.

Before removing the fan control card cable assembly

Procedure
1. Power off the array enclosure.
2. Disconnect all cables from the enclosure, including the power cables.
3. Loosen the captive CTO screws (2) behind the latch (1) on the front left and right bezel ears of the
enclosure.
4. Slide the enclosure out of the rack and set it on a secure surface.
5. Remove the rear CTO hold down bracket.
6. Remove the storage controller enclosure from the rack.
a. Back up all data before removing the enclosure from the rack.
b. Remove or unplug all cables.
7. Remove the fan modules. See Removing a fan module on page 62.
8. Pull the hood latch up and back (1 and 2), and lift the enclosure cover up and remove it (3).