Table of Contents

Advertisement

Instruction manual - GB
Instruction
manual
www.atmos.cz

Advertisement

Table of Contents
loading

Summary of Contents for Atmos DC105S

  • Page 1 Instruction manual - GB Instruction manual www.atmos.cz...
  • Page 2 Instruction manual - GB www.atmos.cz...
  • Page 3: Table Of Contents

    11. Fire prevention during installation and use of heating appliances 12. Connecting boilers to the electric network 13. Wiring diagram of boiler DC105S, DC150S with a flue gas thermostat and two exhast fans 14. Obligatory ČSN EN standards related to boiler designing and installation 15. Choice and connection method of control and heating elements 16.
  • Page 4 24 to 36 months. The guarantee period for other parts remains 2-year long. In non-compliance with these principles, the drum’s and the heatproof shaped pieces’ service life may dramatically decrease due to low-temperature corrosion. The boiler drum may corrode in as little time as 2 years. www.atmos.cz 4-GB...
  • Page 5: Intended Use

    Instruction manual - GB 1. Intended use The environmentally friendly boilers ATMOS DC105S and DC150S are intended for heating in gardening centres, large houses, various workshops, business premises and similar buildings. The boilers are suitable for outputs ranging between 70 - 150 kW.
  • Page 6: Control Panel Appearance

    The large feeding hopper allows burning of large wood logs and splits up to 550 / 750 mm max. length. The boilers are fitted with a cooling loop protecting it against overheating and with two thermostats for switching the boiler-circuit pump. www.atmos.cz 6-GB...
  • Page 7: Technical Data

    Instruction manual - GB 3. Technical data ATMOS boiler type DC105S DC150S Boiler output Heating surface Fuel shaft volume Feeding hole dimensions 450 x 315 450 x 315 Specified chimney draught Max. operating water-pressure Boiler weight 1030 Gas-outlet pipe diameter Boiler height...
  • Page 8: Boiler Drawing Key

    21. Module AD03 - 2x or a water heater) 22. Door closing R – spare output (such as for an expansion tank 23. Filling-in valve or a water heater) Technical data Dimensions DC105S DC150S 1813 1813 1010 1010 1095 1295...
  • Page 9: Drawing Of The Boiler

    Instruction manual - GB Drawing of the boiler DC105S DC150S www.atmos.cz GB-9...
  • Page 10: Extraction Ventilator Schematics

    Large gasket (2 pcs) Small gasket 4. Type and seating of shaped pieces into combustion area For type: DC105S DC150S CAUTION – The spherical space must be fully insert on the back wall of the combustion chamber. 5. Boiler supplied accessories...
  • Page 11: Fuel

    ● Example – spruce wood which has been stored for 1 year under shelter – see graph The graph illustrates the boilers maximum output with wet fuel. DC105S - 84 DC150S - 120 Boilers are not suitable for burning wood with moisture content lower than 12 %.
  • Page 12: Boiler Base

    Instruction manual - GB 7. Boiler base We recommend providing a concrete (metal) base under the boiler. Boiler type [mm] DC105S 1000 DC150S 1000 1000 8. Environment type and boiler placement in a boiler room Boilers may be used in a “basic environment” - AA5/AB5 as specified in Czech standard ČSN3320001.
  • Page 13: Flue-Gas Duct

    1 - Waste gas thermometer 2 - Cleaning aperture 3 - Throttle valve (draught limiter) In case of excessive chimney draught, install a throttle valve or draught limiter (regulator) /3/. www.atmos.cz GB-13...
  • Page 14: Fire Prevention During Installation And Use Of Heating Appliances

    (such as gluing linoleum, PVC etc.) the boilers must be put out of operation long enough before the risk occurrence. No items from flammable materials may be placed on the boilers or near them in a distance lower than the specified safe distance (more ČSN EN 13501-1). www.atmos.cz 14-GB...
  • Page 15: Connecting Boilers To The Electric Network

    1 - connector for power cord - black (L - brown, N - blue, PE - green/yellow) 2 - connector for pump in boiler circuit - white (L - brown, N - blue, PE - green/yellow) 3 - connector for exhaust fan 2 4 - connector for exhaust fan 1 www.atmos.cz GB-15...
  • Page 16: Wiring Diagram Of Boiler Dc105S, Dc150S With A Flue Gas Thermostat And Two Exhast Fans

    Instruction manual - GB 13. Wiring diagram of boiler DC105S, DC150S with a flue gas thermostat and two exhast fans www.atmos.cz 16-GB...
  • Page 17: Obligatory Čsn En Standards Related To Boiler Designing And Installation

    TS 131 3/4 A (95 °C) or WATTS STS 20 (97 °C) valve to the public water system. In cases when the user has his/her own well, the boiler can be additionally protected by using a back-up power supply (battery with an exchanger) www.atmos.cz GB-17...
  • Page 18: Boiler Corrosion Protection

    For the heating system regulation we recommend regulation elements provided by the following companies: For the control of the heating system we recommend the following controllers: a) ATMOS ACD 01 - equithermal control set for solid fuel boilers b) KOMEXTHERM, Praha tel.: +420 235 313 284 c) KTR, Uherský...
  • Page 19: Prescribed Boiler Connection With Controlled Return Water In To The Boiler And An Buffer Tank

    A section B in copper in steel in copper in steel DC105S, DC150S 54x2 50 (2”) 42x1,5 40 (6/4”) In case that a cooling loop preventing overheating is connected, it is possible to omit the floating non- return flap valve on bypass of the pump, thermal valve or of the three-way mixing valve.
  • Page 20: Thermoregulatory Valve

    (and if adhered to specified min. accumulation tanks volumes – see chart) this could take 1 – 3 days. If the accumulation method (5000 - 6000 litres for DC105S), (8000 - 9000 litres for DC150S) can- not be used, then the boiler must be connected with at least one tank of 1000 litre volume for equalising the boiler start-ups and run-outs.
  • Page 21: Operating Instructions

    Through the top door /2/ insert dry wood kindling on the heatproof shaped piece /5/. Place the kindling perpendicularly to the channel recess in the shaped piece so that a 2 – 4 cm gap between the recess and fuel is created; which allows the www.atmos.cz GB-21...
  • Page 22: Waste Gas Thermnostat Setting

    (85/90 °C). When operating the boiler in an lower output mode, it is possible to use just one ventilator. Operating temperature of water in the boiler must be in the 80 - 90 °C range. www.atmos.cz 22-GB...
  • Page 23: Setting The Boiler Output And Combustion

    (unfastened) (one fan) primary air flaps opened at X = 1/2 (50 %) both thermostats off (unfastened) (fans - 1, 2) primary air flaps opened at X = 10 mm - actuators without power The flaps opening at X = 1/2 (50 %) corresponds to the standard setting for the rated boiler output with specified fuel. INFO - When running one fan boilers DC105S and DC150S achieves output of 70 - 80 kW. www.atmos.cz GB-23...
  • Page 24: Fuel Refill

    Instruction manual - GB Basic setting of secondary air Setting of the rear secondary air: DC105S Exhaust fully closed (0 mm) + 8 mm Setting of the rear secondary air: DC150S Rear secondary air fully closed (0 mm) + 15 mm...
  • Page 25: Slow-Burning Mode

    – ash-pan spherical space NOTE –regular and thorough cleaning is important for permanent effectiveness and a long service life of your boiler. If not cleaned properly, damage to the boiler may occur – the manufacturer’s guarantee is rendered invalid. www.atmos.cz GB-25...
  • Page 26 Sample cleaning of the flue way - bottom lid brush - upper lid (on the both side) Remove flue gas brake before cleaning. Sample cleaning of the tube exchanger with a Checking the exhaust fans of the boiler wire brush - front lid www.atmos.cz 26-GB...
  • Page 27: Heating System Maintenance - Including Boilers

    Cleaning doors must always be properly closed. CAUTION - Follow valid fire regulations and have in reach portable fire extinguisher. If any non-standard behavior of the boiler shut down the boiler from operation and call the service. www.atmos.cz GB-27...
  • Page 28: Possible Failures And Troubleshooting

    (using a pen) - safety thermostat fuse inter- rupted - clean the ventilator including - rotating wheel clogged Ventilator does not turn the ducting from tar and sedi- ments - replace - defective capacitor - replace - defective motor - check - measure www.atmos.cz 28-GB...
  • Page 29: Spares

    Module AD03 (cede: P0436) /21/ CAUTION – the J22RR552 (2x) exhaust fan with rotating wheel of 200 mm diameter and 65 mm high is intended for boiler types DC105S and DC150S. Heatproof shaped piece (nozzle) replacement Material list 1. heatproof shaped piece 2.
  • Page 30: Door Sealing Cord Replacement

    „20 minutes past the hour“ position. Then tighten the nut. 32. Environmental protection The ATMOS gasifying boilers comply with the most demanding environmental requirements and were awarded the “Environmentally friendly product” mark, in compliance with directive No.
  • Page 31: Guarantee Conditions

    For boiler types designated for the Czech Republic, Poland, Russia, Romania, Lithuania, Latvia and Hungary no guarantee conditions or insurance policies from outside these countries apply. Guarantee and post-guarantee period repairs are carried out by: company represent- ing ATMOS in the particular country for the particular region installation company that carried out the installation - Jaroslav Cankař a syn, ATMOS, Velenského 487, 294 21 Bělá pod Bezdězem, Czech Republic, Tel.
  • Page 32: Boiler Installation Report

    At the start up stage, the functional check of Size: ............the boiler and all its control and safety Moisture content: ........* elements was carried out. Person responsible for the inspection: ..........Date: ......Stamp : ..........Customer’s signature: ........(Responsible person’s signature) * measured values www.atmos.cz 32-GB...
  • Page 33: Annual Inspection Records

    Stamp and signature Stamp and signature Date Date Date Date Stamp and signature Stamp and signature Stamp and signature Stamp and signature Date Date Date Date Stamp and signature Stamp and signature Stamp and signature Stamp and signature www.atmos.cz GB-33...
  • Page 34: Records About Guarantee Period And After-Guarantee Period Repairs

    Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..........................................repair carried out by (whom), date Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..............................Repair: ..........................................repair carried out by (whom), date www.atmos.cz 34-GB...

This manual is also suitable for:

Dc150s

Table of Contents