18. Prescribed boiler connection with the thermoregulation valve and with buffer tanks 19. Thermoregulation valve 20. System operation with storage tanks ATMOS storage tanks delivered on regular basis Tanks insulation Advantages 21. Connection of cooling loop against overheating with safety-valve Honeywell TS 130 - 3/4 A or WATTS STS20 22.
Page 4
24 to 36 months. The guarantee for other parts does not change. In case these principles are not adhered to the service life of the boiler drum and ceramic fittings can be substantially reduced due to the low-temperature corrosion. The boiler drum can corrode within two years. www.atmos.cz 4-GB...
Instruction manual - GB 1. Purpose of use The ecological hot water boilers ATMOS DC 50/60/70 GSX are destined for heating the one-fa- mily houses, weekend houses, cottages and similar houses with 50 - 70 kW heat losses depending on the type.
1. Thermometer – it monitors the output water temperature from the boiler. 2. 1.Master switch – itenables to switch off the whole boiler if necessary. 3. Flue gas thermostat (1) – it serves for ventilator switching off after the fuel has burnt down. www.atmos.cz 6-GB...
A big hopper enables to burn the cleft tim- ber of 530mm length. Also the big pieces of wood waste can be burnt. All boilers are equipped with the cooling loops against overheating. www.atmos.cz GB-7...
- GB 3. Technical data Type of ATMOS boiler DC50GSX DC60GSX DC70GSX Boiler output Heat-up area Fuel shaft volume Filling hole dimension 450x310 450x310 450x310 Specified draught of the chimney Pa Maximum water overpressure Boiler weight Draw-off throat diameter...
DC50GSX fitting /10/ is in the 3 cm distance DC60GSX from the front edge of the boiler frame. CAUTION – do not turn the rear face in case of possible manipulation www.atmos.cz GB-11...
Wood with 60% water has the thermal value 1,5kWh /lkg wood • e.g. whitewood stored 1 year under shelter - shown in the diagramrafu Max. boiler output with a wet fuel shown in the diagram. DC 50 GSX - 39 DC 60 GSX - 44 DC 70 GSX...
(neither in corridors). The cross section of the ope- ning for combustion air inlet into the boiler-room must be minimum 350 cm in case of boilers with 35-70 kW output. 1 - Chimney 2 - Smoke-flue 3 - Boiler www.atmos.cz GB-13...
1 Flue gas thermometer 2 Cleaning opening 3 Throttle (draught limiter) INFO - In case of a strong draught in the chimney install a throttle (3) or a draught limiter in the smoke-flue . www.atmos.cz 14-GB...
fire or explosion (e.g. linoleum, PVC gluing etc.) the boiler must be put out of operation in a timely manner it means before the danger occurence. Do not put any items made of combustible materials on the boiler neither within the distance smaller than the safety distance (more ČSN EN 13501-1). www.atmos.cz GB-15...
1 - connector for income cabel (L - brown, N - blue, PE - green/yellow) 2 - connector for pump in the primary circuit (L - brown, N - blue, PE - green/yellow) (type EU and for Sweden - variant B) 3 - connector for extraction fan www.atmos.cz 16-GB...
When installing the boiler please underlay the rear part of boiler by 10 mm to be better flushed and vented. The regulators of following firms are recommended for the heating system regulation: a) ATMOS ACD 01 - the set of equithermal regulation for solid fuel boilers b) KOMEXTHERM, Praha tel.: +420 235 313 284 c) KTR, Uherský...
Minimal diameters of piping at the connection with the storage tanks Type and boiler output Part A Part B In copper In steel In copper In steel DC50GSX 42x1,5 40 (6/4”) 35x1,5 32 (5/4”) DC60GSX, DC70GSX 54x2 50 (2”) 42x1,5 40 (6/4”) www.atmos.cz GB-19...
RECOMMENDED MINIMUM VOLUMES OF ACCUMULATORS Type DC50GSX DC60GSX DC70GSX Output Volume 3000-4000 3500-4500 4000-5000 ATMOS storage tanks delivered on regular basis TYPE OF TANK VOLUME (l) DIAMETER ( mm ) HEIGHT ( mm ) AN 500 1944/1940* AN 750 750/790* 1974/1752*...
Exp. tank of min. 4 l clack valve CAUTION – the cooling loop against overheating according to EN 303-5 must not be used for the purposes different from the protection against overheating (never for heating the service water). www.atmos.cz GB-21...
NOTE – All doors must be properly shut during the boiler operation and the control cable(tow bar) of the firing-up safety valve must be tucked otherwise the ventilator (S) can be damaged. www.atmos.cz 22-GB...
FR 124 draught regulator. In this way the maximum combustion products temperature (180 - 220°C) at the boiler operation at the rated output and the maximum efficiency is guaranteed. www.atmos.cz GB-23...
(to the screw). The prescribed operating water temperature in the boiler (80 - 90°C) must always be tuned by means of mixing valves behind the boiler, this either manually or by means of electronic regulation with the servo-drive. www.atmos.cz 24-GB...
1 revolution anticlockwise we open the secondary air by 1,75 mm (1 revolution = 1,75 mm). The manufacturer set the regulation to ap- prox. 9 mm opening (up to the stop + 5 revolutions anticlockwise). www.atmos.cz GB-25...
(wood-coal) are left in the hopper for the next firing. We open the cleaning cover /15/ and we clean the rear flue way and flue plate by means of a brush. If an air-break valve is inserted in the the channel it must be www.atmos.cz 26-GB...
Page 27
fire hook Sample cleaning of the flue way with a wire Sample cleaning and ash removing from the brush - upper lid bottom part of the flue way - bottom lid www.atmos.cz GB-27...
The boiler must always be cleaned duly and in a timely manner in order to ensure the throughput rate of all draughts. The filling and ash- -pan doors must always be properly shut. www.atmos.cz 28-GB...
- replace The ventilator does not rotate - faulty engine - replace - faulty servo-drive on the air flap - replace - faulty contact in the socket of the - check - measure inlet cable from the engine www.atmos.cz GB-29...
Then we stretch them on the sides and forward on the nozzle and by slight hammering we evenly caulk them on four sides so that they are abreast with the nozzle. We apply the boiler cement on the gasket joints. www.atmos.cz 30-GB...
20 minutes on the imaginary clock. Eventually we tighten the nut. 33. Ecology The ATMOS gasification boilers meet the highest demands on the ecology therefore they meet the conditions of awarding the certificate of “Environmentally friendly product “ according to the dire- ctive no.
Czech Republic, Poland , Russia, Rumania, Lithuania, Latvia and Hungary. The guarantee and post-guarantee repairs are provided by: - The firm representing ATMOS in a particualr country for a given region - the installation company that installed the product - Jaroslav Cankař...
At the start-up there was checked the function Size: ............of boiler and all regulation and safety elements Moisture: ..........* Person responsible for the inspection: ......... Date: ............Stamp: ..........Customer ´s signature: ......(signature of the responsible person) * measured values www.atmos.cz GB-33...
Stamp and signature Stamp and signature Date Date Date Date Stamp and signature Stamp and signature Stamp and signature Stamp and signature Date Date Date Date Stamp and signature Stamp and signature Stamp and signature Stamp and signature www.atmos.cz 34-GB...