Rigging Grommet Mounting; Rigging Grommet Description; Installing The Shift Cable - Yamaha F150A Service Manual

Outboard engine
Hide thumbs Also See for F150A:
Table of Contents

Advertisement

7. Install the mounting bolts, and then
tighten the nuts firmly.
Make sure that the clamp brackets do not
bite into the boat transom.
8. Tighten the locknuts firmly.

Rigging grommet mounting

Rigging grommet description

1
10
9
8
1. Main wiring harness
2. Water temperature lead (optional)
3. Water pressure hose (optional)
4. Isolator lead (optional)
5. Battery cable
6. Gauge harness or 6Y8 Multifunction
Meter harness
7. Fuel hose
8. Speedometer hose
9. Shift cable
10. Throttle cable

Installing the shift cable

Always perform the cable adjustment in
advance, following the procedures in the
remote control operation manual.
1. Remove the rubber seal "1" from the
2. Fully screw in the shift cable joint "1" to
2
3
4
5
6
3. Move the remote control lever to the N
7
4. Disengage the holder "1" from the shift
TIP:
Shift cable position can be adjusted using the
shift cable holder "2".
3-9
Rigging grommet mounting
retaining plate "2", and then remove the
retaining plate "2".
1
2
the shift cable "2".
2
position.
cable holder "2".
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl150aF150bFl150b

Table of Contents