PIAGGIO MP3 500 i.e. SPORT Service Station Manual page 175

Table of Contents

Advertisement

MP3 500 i.e. SPORT Business_LT_ ABS-ASR_EU_USA (2015)
- Oil vapour decantation chamber
- Temporarily install the distribution timing check
hole cover and the engine oil filling cap/bar.
- Insert the blow-by recovery duct using a new O-
ring.
- Tighten the screws to the prescribed torque.
Locking torques (N*m)
Blow-by recovery duct fixing screws
- Insert the spring and the by-pass piston on the
flywheel cover.
N.B.
LUBRICATE THE BY-PASS VALVE.
- Reinstall the blow-by reed valve using a new
sealing gasket.
- Reinstall the support with head and tighten the
screws to the prescribed torque.
Locking torques (N*m)
Supporting screws with bulkhead
- Correctly fit a new O-ring, do not allow it to come into contact with grease or oil.
FAILURE TO OBSERVE THIS PRECAUTION WILL IRRETRIEVABLY DEFORM THE O-RING.
3 - 4
0.3 ÷ 0.4
Engine
ENG - 175

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents