2. Disassembly Process
2-1 Equipment Needed & Product Overview
1. Screw Bit (+) :105
2. Screw Bit (+) :107
3. Screw Bit (-) :107
4. Hex Sleeves 5 mm
5. Hex Sleeves :14.0 mm
6. Needle-nose pliers
7. Projector
* Caution:
-This process is protective level II. Operators should wear electrostatic chains.
-The unit should be powered down and disconnected from mains.
-When disassemble Engine module (2-18), please notice that it require specific
environmental conditions (clean room).
EK-800U
Chapter 2 Disassembly Process
2-1