Insert Sctp Endpoint Timers And Protocol Parameters (Rc/V 33.18); Insert Sctp Endpoint Timers And Protocol Parameters - Lucent Technologies 5ESS Manual

Session initiation protocol (sip) - oa&m 5e16.2 and later software releases
Table of Contents

Advertisement

Insert SCTP Endpoint Timers and Protocol Parameters (RC/V
33.18)
....................................................................................................................................................................................................................................
Purpose
When to use
Related information
Admonishments
Before you begin
Procedure
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
SCTP Endpoint Parameters (RC/V 33.18) defines the SCTP endpoint
related timers and protocol parameters.
A default (DEFAULT) parameter set is defined when either the first
SCTP near endpoint is provisioned or when the first non-DEFAULT
SCTP endpoint parameter set is provisioned. This procedure should be
followed to create a new parameter set, or to modify individual
parameter values (within the allowable ranges for each parameter) that
are different (non-default) from the default value.
Refer to 235-118-258, Recent Change Reference, for information on
the RC/V system.
The parameters and timers in this form have default values. Changing
any parameter or timer could cause an interruption in service. Care
should be taken when changing the predefined values.
Required Tools
Supplemental Trunk Line Workstation (STLWS) or Recent
Change and Verify (RC/V) terminal
Access to RC/V Menu Interface
Required Material
®
The 5ESS
release with the SIP for Packet Trunking - NAR feature software.
Required Information
SCTP Endpoint Parameter Set Name.
Required Conditions
Secured Feature 684 is enabled (RC/V 8.22)
SIP GSM is defined (RC/V 5.80)
............................................................................................................................................................
Select and prepare terminal for RC/V activities.
1
Lucent Technologies
switch must be running a 5E16.2 FR3 software
Provisioning
5 - 5 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents