Deprovisioning Sequence; Deprovisioning Flowchart - Lucent Technologies 5ESS Manual

Session initiation protocol (sip) - oa&m 5e16.2 and later software releases
Table of Contents

Advertisement

Deprovisioning Sequence

....................................................................................................................................................................................................................................
Introduction
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
This section contains the procedures for deprovisioning the SM
connectivity and signaling.
(6-4)
contains a flowchart that indicates the order the RC/V views are
executed and the
"Deprovisioning Sequence" (6-5)
more details for deprovisioning the SIP application.
Note:The SM connectivity deprovisioning does not apply on
DRM/VCDX.
Refer to 235-105-331, Hardware Change Procedures - Degrowth for
information on OIU-IP degrowth procedures to delete IP bearer, if IP
packet trunking is no longer to be used.
Lucent Technologies
Figure 6-1, "Deprovisioning Flowchart"
Deprovisioning
contains steps with
6 - 3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5ESS and is the answer not in the manual?

Table of Contents

Save PDF