Displaying And Maintaining Monitor Link; Monitor Link Configuration Example - HP 5130 EI Series Configuration Manual

High availability
Hide thumbs Also See for 5130 EI Series:
Table of Contents

Advertisement

Step
3.
Configure the switchover delay
for the downlink interfaces in
the monitor link group.

Displaying and maintaining Monitor Link

Execute the display command in any view:
Task
Display monitor link group information.

Monitor Link configuration example

Network requirements
As shown in
Device C is a Smart Link device, and Device A, Device B, and Device D are associated devices.
Traffic of VLANs 1 through 30 on Device C is dual-uplinked to Device A through a smart link group.
Implement dual uplink backup on Device C. When the link between Device A and Device B (or
Device D) fails, Device C can detect the link fault and perform uplink switchover in the smart link
group.
For more information about Smart Link, see
Figure 28 Network diagram
Device B
Configuration procedure
1.
Configure Device C:
# Create VLANs 1 through 30.
<DeviceC> system-view
[DeviceC] vlan 1 to 30
# Map these VLANs to MSTI 1.
Figure
28:
Device A
Device C
Command
downlink up-delay delay
Command
display monitor-link group { group-id | all }
"Configuring Smart
Device D
118
Remarks
By default, the switchover delay is
0 seconds. The downlink
interfaces come up as soon as an
uplink interface comes up.
Link."

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents