CDA 3S10BL Installation, Use And Maintenance Manual page 14

Table of Contents

Advertisement

2. Remove the chrome cover from the
top of the sphere, then remove and
discard the cylindrical packing piece
from the top bracket within it (Fig. 8).
3. Pass the power cable that exits the
appliance up through the central
bracket within the sphere (Fig. 9).
4. Select the larger diameter hanging
tube and pre-assemble this to the
sphere (Fig. 10):
` •
Thread the power cable through
the top chrome cover and locate
this cover back onto the globe.
` •
Pass the power cable through
the tube ensuring that it enters
through the plain end and exits
the end with the joining piece
fitted.
5. Slide the top cover up the hanging
tube then fit this tube to the sphere
(Figs. 11 & 12). Secure the tube to the
central bracket with two supplied
bolts and nuts.
`
14
Fig. 9
Fig. 10
Fig. 11
Fig. 12

Advertisement

Table of Contents
loading

This manual is also suitable for:

3s10wh

Table of Contents