Expansion Board Options - Inspur SA5112M4 User Manual

Table of Contents

Advertisement

3.
Install the power supply in the power supply bay.
4.
Connect the power cord to the power supply.
5.
Route the power cord through the power cord anchor or cable management arm.
6.
Reposition the cable management arm into the operating position.
7.
Connect the power cord to the power source.
8.
Be sure that the power supply LED is green.
9.
Verify that the corresponding power supply LED on the SID is green.

6.7 Expansion Board Options

The server supports PCI, PCI-X, and PCI Express expansion boards.
Removing Expansion Slot Covers
CAUTION:
To prevent damage to the server or expansion boards, power down the server
and remove all AC power cords before removing or installing the PCI riser cage.
CAUTION:
For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components,
minimize the amount of time the access panel is open.
1.
Power down the server.
2.
Extend the server from the rack.
3.
Remove the access panel.
4.
Remove the full-length expansion board retainer if any full-length expansion boards are
installed.
5.
Remove the PCI riser cage.
6.
Remove the expansion slot cover:
Step 1: Align two fingers to holes on Riser bracket to take out the Riser card.
32

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nf5170m4

Table of Contents