Energy Metering - GE PQMII Instruction Manual

Power quality meter
Table of Contents

Advertisement

6.2.5

Energy Metering

ENERGY
6–12
3Φ/AΦ/BΦ/CΦ kVA MIN/MAX: The minimum/maximum three phase apparent power
as well as the minimum/maximum individual phase A/B/C apparent power is
displayed, along with the time and date of their measurement. This information is
stored in non-volatile memory and will be retained during a loss of control power. The
phase A/B/C minimum/maximum apparent power messages will be displayed only for
a "Wye" connected system.
3Φ/AΦ/BΦ/CΦ PF MIN/MAX: The minimum/maximum three phase lead or lag power
factor as well as the minimum/maximum lead or lag individual phase A/B/C power
factor is displayed, along with the time and date of their measurement. This
information is stored in non-volatile memory and will be retained during a loss of
control power. The phase A/B/C minimum/maximum lead or lag power factor
messages will be displayed only for a "Wye" connected system.
FIGURE 6–1: Power Measurement Conventions
PATH: ACTUAL VALUES
A1 METERING
[ ]
ENERGY
3Φ POS REAL ENERGY
=
32745 kWh
PQMII POWER QUALITY METER – INSTRUCTION MANUAL
CHAPTER 6: MONITORING

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqm ii

Table of Contents