Removal Of Electrical Box / Pcb - Daikin FLKS25BAVMB Service Manual

Inverter pair floor/ceiling suspended dual type ba series
Hide thumbs Also See for FLKS25BAVMB:
Table of Contents

Advertisement

Indoor Unit
1.7

Removal of Electrical Box / PCB

Procedure
Step
1. Remove the PCB.
1
Disconnect the earth
wire and pull out the
indoor heat exchanger
thermistor.
2
Disconnect the 2 relay
harnesses at the rear
side of the fan motor.
3
Remove the electrical
box cover.
(Unfasten the 2 hooks.)
122
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Earth
Fan motor
SiENBE05-722_A
Points
Indoor heat exchanger thermistor
„ Clamp the harnesses and
wires with clips as they were
when reassembling.
Negligence of above
procedure may result in
catching wire with the front
panel and may cause
malfunction.
(R3007)
Hook
Electrical box cover
(R3008)
Removal Procedure
(R3006)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents