Removal of Electrical Box

Procedure
Step
1
Disconnect the
connector for the
overload protector
[S40].
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Outdoor Unit - RK(X)S25/35G2V1B9
Points
Preparation
„ Remove the panels and
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
[S40]
(R11846)
[S80]
(R11848)
(R11844)