Four-Bay Lff Hot-Plug Drive Cage - HP ProLiant ML150 Gen9 Maintenance And Service Manual

Hide thumbs Also See for ProLiant ML150 Gen9:
Table of Contents

Advertisement

Remove the SFF drive cage.
11.
To replace the component, reverse the removal procedure.

Four-bay LFF hot-plug drive cage

To remove the component:
Unlock and remove the tower bezel
1.
Power down the server (on page 23).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Remove all drives
4.
27).
Place the server on its side.
5.
Remove the access panel (on page 24).
6.
If installed, remove the PCI air baffle (on page 25).
7.
Remove the system air baffle (on page 24).
8.
Remove the fans (on page 25).
9.
Disconnect the Mini-SAS cable and the power cable from the drive cage backplane.
10.
("Remove the tower
("Hot-plug
drive" on page 27) and drive blanks
bezel" on page 23).
("Hot-plug drive
Removal and replacement procedures 42
blank" on page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents