Eight-Bay Sff Hot-Plug Drive Cage - HP ProLiant ML150 Gen9 Maintenance And Service Manual

Hide thumbs Also See for ProLiant ML150 Gen9:
Table of Contents

Advertisement

Position the heatsink on the processor backplate.
a.
Tighten one pair of diagonally opposite screws halfway, and then tighten the other pair of screws.
b.
Finish the installation by completely tightening the screws in the same sequence.
c.
Install the system air baffle.
7.
If removed, install the PCI air baffle.
8.
Install the access panel.
9.
Return the server to an upright position.
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Power up the server.
13.
Install and lock the tower bezel.
14.

Eight-bay SFF hot-plug drive cage

To remove the component:
Unlock and remove the tower bezel
1.
Power down the server (on page 23).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Remove all drives
4.
27).
Place the server on its side.
5.
Remove the access panel (on page 24).
6.
If installed, remove the PCI air baffle (on page 25).
7.
Remove the system air baffle (on page 24).
8.
Remove the fans (on page 25).
9.
Disconnect the two Mini-SAS cables and the power cable from the drive cage backplane.
10.
("Remove the tower
("Hot-plug
drive" on page 27) and drive blanks
bezel" on page 23).
("Hot-plug drive
Removal and replacement procedures 41
blank" on page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents