Power Requirements; Machine Installation; Optional Unit Installation - Gestetner G056 Service Manual

Table of Contents

Advertisement

MACHINE INSTALLATION

1.1.4 POWER REQUIREMENTS

!
CAUTION
1. Make sure the plug is firmly inserted in the outlet.
2. Avoid multi-wiring.
3. Be sure to ground the machine.
1. Input voltage level: 120 V, 60 Hz: More than 10 A
2. Permissible voltage fluctuation: ±10 %
3. Do not set anything on the power cord.
1.2 MACHINE INSTALLATION
Refer to the Operating Instructions for details.

1.3 OPTIONAL UNIT INSTALLATION

The following options are available for this machine. Refer to the Operating
Instructions for how to install these options.
• Paper Tray Unit
• 4-bin Mailbox
• 1-bin Shift Tray
• Duplex Unit
• Envelope Feeder
• NIB (G056 only) - the NIB is a standard component for the G058
• Hard disk
• IEEE1394 (G056/G058 - to install in the G058, the NIB must be removed first)
• 64-MB DIMM
G056/G058
220 V ~ 240 V, 50 Hz/60 Hz: More than 6 A
1-2
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

G074G058G073

Table of Contents