Download Print this page

EMC CelerraNS-120 Installation Manual page 8

Advertisement

Remove components from shipping container
Caution: Two people are required to remove the components. Only remove screws holding
!
the components in place at this time. Do not remove the screws holding the rails in place; this
may cause damage to the components. Only remove one component at a time.
1. Using a Phillips-head screwdriver, remove only 7 screws per side. Keep the removed screws
to install the components in the rack.
Ganged rails
2. Carefully set aside each component as
it is removed from the mini-rack shipping
container.
3. The reusable ganged rails
remain in the mini-rack at this time.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Remove ONLY
7 screws
per side.
Mini-rack
Remove this label and
paste it on the back of
the front cover of this
installation guide.
Front
1
2
3
4
TL
A
Mo
de
Se
ria
DA
l Nu
l Nu
Fla
RT
mb
mb
re
Ve
rsi
er
er
Un
Ve
on
Pr
Te
it
rsi
on
Co
e-
ste
d
MA
nfi
SP
C
Ad
gu
re
SP
A
IP
es
dr
d
B
: 19
s
IP
: 19
2.1
2.1
68
.1.
68
20
20
.2.
0
1
8
Remove ONLY
7 screws
per side.
1
Disk-array
enclosure (DAE)
2
Control Station (CS)
3
Standby power
supply (SPS)
4
Storage processor
enclosure (SPE)
5
Blade enclosure
y
r r a
k - a
r e
D i s
s u
c l o
e n
CNS-001457

Advertisement

loading