Download Print this page

EMC CelerraNS-120 Installation Manual page 23

Advertisement

Cabling the EMC Celerra NS-120 system
Connect the NS-120 power cables in the numbered order.
Connect the power cables as shown:
Power distribution panel
(PDP)
B
A
9
6
7
Blade 3
Note: The blade in your Celerra system may have four Ethernet copper ports or two 10-GbE
optical ports and two copper ports.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Disk-array enclosure
2
CS
SPS B
4
SP B
Blade enclosure
5
1
SPS A
3
SP A
SP A
Blade 2
23
PDP
8
CNS-001456

Advertisement

loading